ENGINEERING PROJECTS

Multi-disciplinary Engineering | Water | Roads | Stormwater | Energy | Strategic Planning
End-to-end infrastructure solutions across the full water value chain and built environment. Technical rigor, long-term asset stewardship, and deep understanding of South African municipal operating environments.
Kameelboom-2_800px
1. WATER TREATMENT & QUALITY ASSURANCE

Kameelboom Water Treatment Refurbishment

CLIENT: Moses Kotane LM | Mahikeng, North West | Water Treatment / Process / M&E

Major upgrade to restore compliance and expand capacity for growing demand around Mahikeng.

  • Capacity expansion; replacement of obsolete pumps, filters, and control systems
  • Enhanced chemical dosing and real-time monitoring to meet SANS 241 standards
  • Downstream pipeline and reservoir rehabilitation to protect treated water
  • Low-energy equipment integration to reduce OPEX and carbon footprint

IMPACT: Restored potable water confidence, extended design life, and positioned the municipality for future growth.

Moses-Kotane_800px
2. BULK WATER INFRASTRUCTURE & HYDRAULIC SYSTEMS

Refurbishment of Pump Stations and Bulk Pipelines

CLIENT: Moses Kotane LM | Moses Kotane, North West | Mechanical / Electrical / Structural / Pipeline / Corrosion

Comprehensive asset rehabilitation addressing unplanned downtime, water losses, and escalating maintenance costs.

  • Mechanical: Pumps, mo tors, valves, and pressure vessel replacement/repair
  • Electrical: Control panels, switchgear, and SCADA modernization for remote monitoring
  • Structural: Concrete chambers, foundations, and housing rehabilitation
  •  Pipeline: Cleaning, relining, and replacement to eliminate leaks and bursts
  • Corrosion: Protective coatings, cathodic protection, and sealants

IMPACT: Improved supply reliability, reduced OPEX via energy efficiency, extended asset lifespan, and faster response times.

Magong Bulk Pipeline Development

CLIENT: Moses Kotane LM | Magong, North West | Bulk Distribution / Hydraulic / Civil / Structural

New bulk water backbone across demanding terrain with pressure-stable delivery.

  • Reinforced concrete reservoirs for bulk supply regulation and system buffering
  • Large-diameter pipelines from source to distribution networks
  • Booster pump stations maintaining hydraulic pressure across varied topography

IMPACT: Reliable bulk distribution network supporting current and future community demand.

Magong_800px
3. SOURCE DEVELOPMENT & WATER SECURITY

Magong Village Refurbishment Programme

CLIENT: Moses Kotane LM | Magong Village, North West | Rural Water / Borehole Engineering

Borehole reinforcement and rehabilitation to secure independent, community-level water sources in areas with limited municipal reach.

Groundwater Source Development

Client: Moses Kotane LM | Moses Kotane, North West | Hydrogeology / Geohydrology / Data Systems

Data-driven groundwater optimization to protect aquifers and improve source reliability.

  • Mechanical: Pumps, mo tors, valves, and pressure vessel replacement/repair
  • Re-drilling and rehabilitation of production boreholes to meet yield and quality standards
  • Pipeline, reservoir, and reticulation system repairs
  • NGIS integration and geohydrological reporting for sustainable abstraction planning

IMPACT: Protected groundwater from over-abstraction and provided evidence-based planning data for long-term water security.

Moretele-1_800px
4. NETWORK OPTIMISATION & DEMAND MANAGEMENT

Water Conservation & Demand Management – Mogwase

CLIENT Moses Kotane LM | Mogwase, North West | WC/WDM / Leak Detection / Metering

Integrated demand management in a water-stressed growth corridor (urban growth + mining + tourism). NRW losses exceeded 30%.

  • Systematic leak detection and repair; accurate consumer metering and billing
  • Seasonal drought restrictions and public awareness campaigns
  • Treated effluent reuse for industrial and irrigation purposes
  • Stakeholder-informed integrated resource planning balancing mining, tourism, and community needs

IMPACT: Reduced physical and commercial losses, stabilized revenue, and built community capacity for sustainable consumption.

Water Conservation & Demand Management – Moretele

CLIENT: Moretele LM | Moretele, North West | WC/WDM Strategy / Policy / Governance

Multi-stakeholder framework to institutionalize water efficiency across utilities, departments, communities, and policy makers.

  • Utilities: Aged meter replacement and pressure management zones
  • Municipalities: Indigent property leak-fixing programmes
  • Communities: Greywater reuse, tap repair, and irrigation reduction campaigns
  • Policy: WC/WDM enforcement in municipal planning, budgeting, and IDPs

IMPACT: Replicable governance model embedding water efficiency into municipal operations and community behaviour.

Upgrading of Water Meters and Aged Connections

CLIENT: Rustenburg LM | Rustenburg, North West | Asset Management / Metering

Systematic renewal of aged, inaccurate connections undermining revenue and distribution efficiency in a major mining and urban centre.

  • Condition-based survey and prioritized upgrade strategy
  • Procurement and installation of modern compliant meters and connections
  • Hydraulic testing, commissioning, and customer education on usage and billing

IMPACT: Improved revenue accuracy, reduced unaccounted-for water, and enhanced customer understanding of consumption.

Matjhabeng_800px
5. WASTEWATER & ENVIRONMENTAL PROTECTION

Thabong Wastewater Treatment

CLIENT: Matjhabeng LM | Thabong, Free State | Wastewater / Environmental / Public Health

Integrated upgrades across pump stations, sewer networks, and treatment facilities to restore hydraulic capacity and treatment performance.

  • Public Health: Significantly reduced sewage spillages and contamination risks
  • Environment: Protected local water resources and downstream ecosystems

IMPACT: Restored wastewater compliance and safeguarded community health and environmental quality.

Mogwase_800px
6. ROADS, STORMWATER & BUILT ENVIRONMENT

Construction of 1.6km Paved Roads and Stormwater Infrastructure

CLIENT: Nala LM | Wesselsbron / Monyakeng Ext. 12 & 13, Free State | Civil / Roads / Stormwater

Formal infrastructure delivery for rapid urban expansion, eliminating flooding risks and improving accessibility.

  • 1.6km paved roads to municipal geometric and pavement standards
  • Integrated stormwater: kerbs, channels, and culverts for runoff management
  • Earthworks, subgrade preparation, and connection to municipal drainage networks
  • Traffic geometry and safety measures for residential and light municipal use

IMPACT: Climate-resilient urban infrastructure aligned with integrated human settlement and spatial development objectives.

Maquassi-Hills-2b_800px
7. MUNICIPAL INFRASTRUCTURE & ENERGY

Installation of 26 High Mast Lights

CLIENT: Maquassi Hills LM | Maquassi Hills, North West | Electrical / Structural / Lighting / Construction Management

Turnkey large-area illumination to improve public safety and extend productive hours.

  • Site prep, excavation, and reinforced concrete foundations with anchor bolts
  • Crane-assisted steel mast erection with full lifting and structural safety compliance
  • Cabling, feeder pillars, power connections, and energy-efficient luminaries
  • Electrical safety checks, lux-level verification, and formal handover

IMPACT: High-performance public lighting with full regulatory compliance and operational safety.

Nala-1_800px
8. STRATEGIC PLANNING & INTEGRATED ADVISORY

Water and Sanitation Master Development Plan

CLIENT: Nala LM | Nala, Free State | Master Planning / Governance / Finance

Long-term, evidence-based roadmap aligning water and sanitation investment with demographic and economic growth.

  • Baseline infrastructure audits and demand forecasting
  • Prioritized capital and operational strategies for augmentation and rehabilitation
  • Climate resilience, water conservation, and resource efficiency integration
  • Governance frameworks, cost-recovery models, and funding strategies
  • KPI frameworks and review cycles for plan adaptability

IMPACT: Bankable 20+ year roadmap aligned with DWS requirements and municipal Integrated Development Planning.